Guide · 7 min read
Financial reconciliation for a Local File
Build a clear bridge from entity accounts to transaction-level financial support, with visible exclusions, allocations and unresolved differences.
Updated · Includes completed fictional working examples.
Download completed worksheet (CSV)The working position
- Define the financial population before calculating the result.
- Explain every adjustment between the accounts and the analysed figures.
- Keep arithmetic checks separate from approval of the underlying tax treatment.
Define the bridge you need to build
Start by identifying the entity, period, currency, accounting basis and transaction population. Confirm whether the analysis uses an entity-wide result or a segment. A spreadsheet can add correctly while combining different periods or populations. Write these boundaries above the calculation so the reviewer can assess them before examining individual adjustments.
The OECD Local File framework includes schedules tying analysed financial data to annual accounts. The bridge proposed below is a practical way to make that connection visible. Agree the form of the supporting schedules with the responsible reviewer, particularly where management reporting and statutory accounts use different classifications.
Source references: [1] Annex II, Financial information, second bullet
Separate source data, mapping and judgment
Preserve an identifiable source extract and show the mapping into the analysis. Record the extract date, period, account range and relevant filters. If a revised extract arrives, compare its effect before replacing the earlier version. A change in the source population can invalidate several apparently unrelated calculations.
Use separate columns or schedules for factual mapping and analytical treatment. Mapping identifies where an amount appears in the records. Treatment explains why it is included, excluded or allocated for the analysis. W3C's provenance concept supports keeping production history visible; our recommendation is that a reviewer should be able to follow both paths without reverse-engineering a formula.
Source references: [2] Section 1, Introduction
Example: a transparent cost bridge
Scroll across to read the full table.
| Bridge step | Amount | Evidence needed |
|---|---|---|
| Starting population | EUR 2,400,000 | Agreed extract and account mapping |
| Separate activity | EUR (300,000) | Activity identification and reviewed treatment |
| Duplicate correction | EUR (100,000) | Record-level reconciliation |
| Remaining population | EUR 2,000,000 | Recalculation of the preceding steps |
| Illustrative allocation | 60% = EUR 1,200,000 | Population and rationale for the allocation |
Investigate differences before clearing them
When the ledger, management report and accounts differ, classify the reason before adjusting the bridge. Common investigation categories include scope, timing, currency translation, classification and manual entries. These are prompts for investigation, not permission to treat an unexplained amount as immaterial. Keep an unresolved difference visible until the reviewer decides what it means.
Test totals and signs in both directions. Can the transaction schedule be traced back to the accounts, and can each adjustment in the accounts-to-analysis bridge be located in the supporting records? Check that an exclusion has not also been removed through an allocation percentage. Repeating the calculation independently can reveal a mistake that reviewing the final total alone misses.
Make the review responsibilities visible
Ask finance to confirm the accounting population and explain reconciling items within its knowledge. Ask the responsible tax professional to review the analytical treatment and its consistency with the transaction description. These confirmations answer different questions. A reconciled schedule can still use an inappropriate population or allocation rationale.
The OECD tax-control framework distinguishes responsibility and testing as control components. Our suggested review records therefore state who checked the data, who recalculated the bridge and who approved the treatment. If one person performs several roles, retain the separate questions rather than replacing them with an undifferentiated approval.
Source references: [3] Chapter 2, Essential building blocks of a TCF, printed page 15
Prepare the financial handover
Deliver the bridge with the source version and a concise explanation of material adjustments. Keep formulas understandable and identify any manual inputs. A reviewer should know which values come directly from records, which are calculated and which depend on a professional decision. Where access to underlying records is restricted, agree an appropriate way for the authorised reviewer to inspect them.
For the next cycle, preserve the mapping but reassess its applicability. New accounts, changed activities or revised reporting structures can make a previously sensible mapping misleading. Reuse saves preparation effort only when the current population and treatment remain supported.
- Confirm entity, period, currency and accounting basis.
- Tie the starting population to the agreed records.
- Explain exclusions, allocations and corrections individually.
- Recalculate totals, percentages and signs independently.
- Record unresolved differences and the owner of each decision.
- Identify the exact financial schedules used in the reviewed Local File.
Rebuild Elm Services from six source rows
This completed working paper extends the fictional Elm Services bridge above. It is an arithmetic and review exercise, not client work or a proposed charge. The entity is Elm Services NL, the period is FY2025, and all amounts are EUR. The extract EL-25-v1 was prepared on 10 February 2026. Its six rows are reproduced below; the cited filenames and locators are invented identifiers within this teaching example, not links to confidential records.
The Local File financial-information standard supports a connection between analysed figures and annual accounts. It does not prescribe this worksheet or approve its treatments. In this example, the raw EUR 2,400,000 extract contains one duplicate. Removing L06 leaves EUR 2,300,000 of unique ledger costs, which the fictional controller ties to ACC-25-v1, cost schedule 4. Removing the separate activity then reaches the analytical pool; a separate reviewer must still resolve that treatment.
Scroll across to read the full table.
| Source row and locator | Activity / amount | Mapping for the illustration | Review status |
|---|---|---|---|
| L01 · EL-25-v1, row 2 | Payroll · EUR 1,200,000 | Retain in shared-support population | Accounting amount checked |
| L02 · EL-25-v1, row 3 | Recurring technology · EUR 400,000 | Retain in shared-support population | Accounting amount checked |
| L03 · EL-25-v1, row 4 | Systems invoice SYS-118 · EUR 100,000 | Retain once | Invoice and record identity checked |
| L04 · EL-25-v1, row 5 | Occupancy and overhead · EUR 300,000 | Retain provisionally | Treatment open: see issue F-01 |
| L05 · EL-25-v1, row 6 | Separate project P-17 · EUR 300,000 | Exclude from this shared-support illustration | Project mapping documented; no conclusion on how P-17 should be priced |
| L06 · EL-25-v1, row 7 | SYS-118 repeated · EUR 100,000 | Remove duplicate of L03 | Duplicate identity confirmed; original L03 retained |
Source references: [1] Annex II, Financial information, second bullet
Recalculate the population and the allocation
The source rows total EUR 2,400,000. Removing L05 of EUR 300,000 and the duplicate L06 of EUR 100,000 leaves L01–L04: EUR 2,000,000. Do not remove L03 as well as L06; that would correct the same duplication twice.
The fictional usage extract UM-25-v2, dated 12 February 2026, records 1,000 active account-months across the three recipients. An active account-month is one user account active for one month; leavers and starters are counted only in their active months. The illustration assumes those 1,000 units form the complete agreed population. Applying the recorded shares reproduces the earlier 60% example; it does not establish that account-months suit every service or cost in the pool.
- Reperform the bridge: 1,200,000 + 400,000 + 100,000 + 300,000 + 300,000 + 100,000 = 2,400,000; then 2,400,000 − 300,000 − 100,000 = 2,000,000.
- Reperform Entity D: 600 ÷ 1,000 = 60%; EUR 2,000,000 × 60% = EUR 1,200,000. Recipient allocations sum back to the remaining population.
- Keep issue F-01 open: does the EUR 300,000 occupancy/overhead row relate to these services and recipients, and is the usage key suitable for it? The controller owns source reconciliation; the tax lead owns this treatment decision. Neither an invoice match nor a balanced total answers it.
Scroll across to read the full table.
| Recipient / usage locator | Active account-months | Share of 1,000 units | Illustrative allocation |
|---|---|---|---|
| Entity D · UM-25-v2, row 2 | 600 | 60% | EUR 1,200,000 |
| Entity E · UM-25-v2, row 3 | 250 | 25% | EUR 500,000 |
| Entity F · UM-25-v2, row 4 | 150 | 15% | EUR 300,000 |
| Control total · rows 2–4 | 1,000 | 100% | EUR 2,000,000 |
A balanced bridge can still need a decision
F-01 was opened on 13 February 2026 against working version FW-25-v1. The tax lead requests a facilities-cost breakdown and an explanation of the relationship between those costs, the service and the recipients by 20 February. Until then, the example retains L04 so the calculation remains reproducible, but its EUR 1,200,000 allocation to Entity D is provisional. No markup, arm’s-length charge or approval is implied.
Reader exercise: suppose the responsible reviewer concludes, after obtaining the missing evidence, that all of L04 belongs outside this particular pool and that the 60% share remains suitable for the retained activities. What changes? The pool becomes EUR 1,700,000 and Entity D’s illustrative allocation becomes EUR 1,020,000, a reduction of EUR 180,000. That is a sensitivity answer under stated assumptions, not the decision on F-01. If the key or service boundary also changes, recalculate those inputs rather than reusing 60%.
The completed CSV contains the source extract, signed bridge adjustments, usage inputs, recipient allocations and the open issue. The amounts are plain data rather than spreadsheet formulas. Use the record IDs to reproduce the arithmetic in your own tool; carry the unresolved treatment into the review record before using the calculation in a Local File.
Keep the completed example alongside your own working notes.
Source register
Sources & further reference
Use the references alongside the analysis. Dublon’s suggested registers, review sequences and examples are working practices, unless identified as a requirement in the cited source. Check the rules applicable to the relevant jurisdiction and period.
- [1]OECD — Action 13: Transfer Pricing Documentation (2015)
Annex II, Financial information, second bullet
International documentation framework. Applicable domestic requirements need separate confirmation.
- [2]W3C — PROV Overview (2013)
Section 1, Introduction
A general provenance concept, not a tax rule or a statement about Dublon's technology.
- [3]OECD — Building Better Tax Control Frameworks (2016)
Chapter 2, Essential building blocks of a TCF, printed page 15
Governance principles inform the working practices proposed here; these practices are not prescribed filing requirements.
Related reading
Framework · 4 min
Local File review framework
A review sequence that connects the transaction, evidence and financial result before the team spends time polishing the report.
Framework · 7 min
Source and assumption register
Build a working register that tells a reviewer what supports a statement, what remains uncertain and who can resolve it.
Guide · 7 min
Annual Local File roll-forward
Update a Local File by investigating what changed, preserving useful work and reopening the decisions affected by new facts.
